PART - IV

ANDAMAN AND NICOBAR ADMINISTRATION

ELECTRICITY DEPARTMENT

        Application for electric supply for Domestic/Commercial/Industrial purpose/ Clause 4(a)(i)

 

To

The Executive Engineer/Assistant

Engineer/Junior Engineer

Andaman & Nicobar Islands  

Sir,

I/We hereby inform you, in accordance with clause VI of the schedule to the Indian Electricity Act 1910, within one month or within such a longer period se the Electricity Department may allow from the date of the requisition to supply energy for the premises owner/occupied by me/us and situated within the area of supply.

            Attested/certified copy of valid document/record, issued by the Revenue Authorities/ not below the rank of Tehsildar, in support of my/our right/ title or interest over the land and building and the building plan approved by the Port Blair Municipal Board ( in respect of the building in Port Blair Municipal Area) where the energy supply is hereby requested for are enclosed.  I/We undertake to produce the original records as and when called for.

I/We further require you to supply me/us with the necessary meter/meters on hire in items of section 26 of the Indian Electricity Act,1910. I/we agree to give such security as may be required for the price of the meter/meters, whenever called upon to do so.

(2)     Applicant’s name:

      Occupation/Designation:

      House No. end/or name of the premises

        Street :                             Locality :                                   Town :

        Village or Taluk:

        Owned by:

        Written permission of the landlord tendered

        Yes/No/Not applicable:

      The following are my/our requirements :-

Voltage   

 

No. of point Voltage Total Voltage

 

3.     (A)  Domestic (or residential)

a.       Lights:

b.       Fans:

c.       Heating & Small power

d.       Plug points:

(B)    Commercial power motor &/or Apparatus

a.       Lights:

b.       Fans:

c.       Heating & Small power

d.       Plug points:

No. of HP &  points KW

 

Total  HP & KW

 

Purpose

 

   (C).    Industrial Power Motors and/or apparatus :  

a.       Low voltage:

b.       Medium voltage:

c.       Heating & small power

d.       Plug points:

4.       Total connected load applied in Watt/Kilowatts:

5.       This requisition is for

(i)      A New service:

(ii)     A sub service from an existing service:

       The name and address of the consumer whose service is to be tapped:

(iii) His service No is……………………………………………………

       An extension to my existing installation from service                   No…………………………………………………………….

(iv)   A re-connection of service No………………………………………..

(v)    A change of name from………………………service No…………………..

(vi)   The system of wiring will be:

(vii) The wiring work will be carried out by……………………………..

        Name:

       Address:

       Applicant’s signature:

       Present address:

 Dated the                                of 19

NOTE:

1.       The applicant is requested to complete the clause referring to the requisition and          to strike out the clauses which are not applicable.

2.       Under first provision to clause VI(1) of the schedule to the Indian Electricity Act, 1910 the Electricity Deptt. shall not be bound to comply with any such requisition unless and until the person making it:-

(a)     Within fourteen days after the service on him by the Electricity Department of    notice in writing  in this behalf tender to the Electricity Department a written contract in this form duly executed and with sufficient security binding himself to take the supply of energy for not less than two years to such amount as will assure the department at currents rates a reasonable return and.

(b)    If required by the Department so to do pays the cost of any service line as may be laid down or placed for the purpose of supply upon the property in respect of which the requisition is made, and of so much of any service line as it may be necessary for the said purpose to lay down or place beyond 30 meters from the department’s distributing mains, although not on that property.

(c)  The application is liable to be rejected, if the licence is satisfied that the applicant is in unauthorised occupation of the premises, where electrical energy supply is applied for. The applicants are therefore, required to furnish, valid documentary proof issued by the Revenue Authorities not below the rank of Tehsildar, in support of their right, title or interest in or over the land and the building and the building plan duly approved by the Port Blair Municipal Board, in respect of the building within Port Blair Municipal areas.